DocumentCode
2734240
Title
Proper testing of protection systems ensures against false tripping and unnecessary outages
Author
Peterson, Oliver ; Scharlach, Rogerio ; Baltazar, Cesar
Author_Institution
Commonwealth Edison Co., Lombard, IL, USA
fYear
2009
fDate
21-26 June 2009
Firstpage
70
Lastpage
83
Abstract
This paper discusses the role of three-phase primary injection testing as an important part of the substation commissioning process. Individually testing the components of a protective relay scheme is common practice. Many times, this testing is performed without looking at how the equipment under test interacts with all the other components of the protective relay scheme. Several relay misoperations can be avoided by executing an overall testing plan with all the interconnected components. Three-phase primary current injection tests can be easily performed during equipment commissioning and can detect mistakes that would otherwise only be detected when load is available. This paper describes the planning, execution, and analysis of results of three-phase primary injection tests.
Keywords
relay protection; substation protection; transformer testing; protection system testing; relay protection scheme; substation commissioning process; three-phase primary injection testing; transformer testing; Circuit testing; Current transformers; Instrument transformers; Performance evaluation; Power system protection; Power system relaying; Power transformers; Protective relaying; System testing; Voltage; avoid misoperations; bus protection; current transformers; management of protection; testing and commissioning; testing procedures; through-fault; transformer protection; transformer testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Pulp and Paper Industry Technical Conference, 2009. PPIC '09. Conference Record of 2009 Annual
Conference_Location
Birmingham, AL
ISSN
0190-2172
Print_ISBN
978-1-4244-3464-0
Electronic_ISBN
0190-2172
Type
conf
DOI
10.1109/PAPCON.2009.5185429
Filename
5185429
Link To Document