DocumentCode :
2739695
Title :
Minimizing earliness and tardiness of job completions about a fuzzy due date
Author :
Lam, S.S. ; Cai, X.
Author_Institution :
Dept. of Syst. Eng. & Eng. Manage., Chinese Univ. of Hong Kong, Shatin, Hong Kong
Volume :
2
fYear :
1998
fDate :
4-9 May 1998
Firstpage :
869
Abstract :
We examine the problem of scheduling n jobs on a single machine. Each job i is associated with a weight wi and a processing time pi, and the objective of the problem is to minimize the weighted earliness and tardiness of job completions from a common due date D, where D is a fuzzy number, governed by a triangular membership function. A fuzzy distance function is introduced first to measure the deviations of job completions from the fuzzy due date. Then, a property of an optimal schedule is obtained, and a pseudo-polynomial algorithm that can find the optimal schedule under a condition is derived. Numerical results are also reported to show the effectiveness of the algorithm in general cases where the condition is not satisfied
Keywords :
computational complexity; fuzzy set theory; minimisation; production control; common due date; earliness; fuzzy distance function; fuzzy due date; fuzzy number; job completions; pseudo-polynomial algorithm; scheduling; tardiness; triangular membership function; Councils; Optimal scheduling; Production; Research and development management; Scheduling algorithm; Single machine scheduling; Systems engineering and theory;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Fuzzy Systems Proceedings, 1998. IEEE World Congress on Computational Intelligence., The 1998 IEEE International Conference on
Conference_Location :
Anchorage, AK
ISSN :
1098-7584
Print_ISBN :
0-7803-4863-X
Type :
conf
DOI :
10.1109/FUZZY.1998.686232
Filename :
686232
Link To Document :
بازگشت