Title :
State of the Art of 1 MW/105-140 GHz/10 Sec Gyrotron Project in GYCOM
Author :
Nichiporenko, V.O. ; Agapova, M.V. ; Denisov, G.G. ; Ilyin, V.I. ; Litvak, A.G. ; Malygin, S.A. ; Myasnikov, V.E. ; Popov, L.G. ; Solujanova, E.A. ; Zapevalov, V.E. ; Tai, E.M.
Author_Institution :
GYCOM Ltd., Nizhny Novgorod
Abstract :
In a frame of Russian-German scientific cooperation GYCOM Ltd. and IAP develop 1-MW power level dual/multi-frequency gyrotrons. Two long pulse industrial tubes have been built up to now. First gyrotron is installed in IPP, Garching, Germany in July, 2005. Second tube with similar design and parameters was successfully tested and is prepared for shipping to IPP. Problem of output window creation for multifrequency megawatt level continuous wave (CW) gyrotron is in solving now.
Keywords :
gyrotrons; millimetre wave devices; Garching; Germany; IAP; IPP; Russian-German scientific cooperation; GYCOM Ltd; frequency 105 GHz to 140 GHz; multifrequency megawatt level continuous wave gyrotron; output window creation; power 1 MW; time 10 s; Frequency measurement; Fusion reactors; Gyrotrons; Heating; Manufacturing; Plasma sources; Power generation; Radio frequency; Temperature control; Testing;
Conference_Titel :
Infrared Millimeter Waves and 14th International Conference on Teraherz Electronics, 2006. IRMMW-THz 2006. Joint 31st International Conference on
Conference_Location :
Shanghai
Print_ISBN :
1-4244-0400-2
Electronic_ISBN :
1-4244-0400-2
DOI :
10.1109/ICIMW.2006.368546