DocumentCode
2741217
Title
Two-layer online scheduling of flexible manufacturing systems
Author
Engell, Sebastian ; Moser, Manfred
Author_Institution
Fraunhofer-Int. IITB, Karlsruhe, West Germany
fYear
1990
fDate
21-23 May 1990
Firstpage
435
Lastpage
443
Abstract
The authors address the scheduling problem in production units which consist of several subsystems, e.g. workshops or flexible manufacturing cells. A two-layer architecture is proposed; on the local level, intelligent control units perform an optimization, and the upper-level scheduler coordinates the subsystems. The coordination problem is solved based on the mathematical description of the overall system in terms of the so-called minimax algebra. The proposed decomposition-and-coordination strategy will be successful if local schedules can be found such that the local deadlines are met. Algorithms that avoid excessive delays for local scheduling problems are discussed
Keywords
flexible manufacturing systems; manufacturing data processing; matrix algebra; minimax techniques; online operation; scheduling; FMS; decomposition-coordination strategy; flexible manufacturing systems; minimax algebra; online scheduling; optimization; two-layer architecture; Computer aided manufacturing; Computer integrated manufacturing; Control systems; Flexible manufacturing systems; Intelligent control; Job shop scheduling; Processor scheduling; Production planning; Production systems; Throughput;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Integrated Manufacturing, 1990., Proceedings of Rensselaer's Second International Conference on
Conference_Location
Troy, NY
Print_ISBN
0-8186-1966-X
Type
conf
DOI
10.1109/CIM.1990.128140
Filename
128140
Link To Document