• DocumentCode
    2741940
  • Title

    A model of the F18 mission computer software for pre-run-time scheduling

  • Author

    Shepard, Terry ; Gagné, Martin

  • Author_Institution
    R. Mil. Coll. of Canada, Kingston, Ont., Canada
  • fYear
    1990
  • fDate
    28 May-1 Jun 1990
  • Firstpage
    62
  • Lastpage
    69
  • Abstract
    The development of pre-run-time schedulers for certain hard real-time applications is investigated. This scheduling scheme requires the modeling of the program as a set of processes with corresponding timing specifications, such as release times, computation times, and deadlines. The models must specify precedence and exclusion constraints between pairs of processes. It is processed by an offline pre-run-time scheduling algorithm that computes a schedule for use at run time, ensuring that all static timing constraints of the system are observed. The technique works best in cases in which most processes are periodic, which is true for the F-18. A modeling process for the M18 Mission Computer software that is designed to lead the application of pre-run-time scheduling to the software and is applicable to other such hard systems is described
  • Keywords
    aircraft instrumentation; distributed processing; real-time systems; scheduling; CF-188 avionics subsystems; F/A-18 aircraft; F18 mission computer software; computation times; deadlines; exclusion constraints; operation flight program; pre-run-time scheduling; precedence; real-time applications; release times; static timing constraints; timing specifications; Aircraft; Application software; Military computing; Processor scheduling; Runtime; Scheduling algorithm; Software maintenance; Software performance; Testing; Timing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Distributed Computing Systems, 1990. Proceedings., 10th International Conference on
  • Conference_Location
    Paris
  • Print_ISBN
    0-8186-2048-X
  • Type

    conf

  • DOI
    10.1109/ICDCS.1990.89285
  • Filename
    89285