• DocumentCode
    2746209
  • Title

    An empirical IT contingency planning model for disaster recovery strategy selection

  • Author

    Wiboonrat, Montri

  • Author_Institution
    Grad. Sch. of Inf. Technol., Assumption Univ., Bangkok
  • fYear
    2008
  • fDate
    28-30 June 2008
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    In todaypsilas banking industry, 24 times 365 hours of service availability is of utmost importance to gaining competitive advantage. Proper IT contingency planning (ITCP) for disaster recovery (DR) insures business continuity and optimizes investment. This research investigates fundamental requirements of each banking business unit for mapping criticality of business continuity to DR readiness. The process assesses the recovery time objective (RTO) and the recovery point objective (RPO) to assure business continuity within a maximum tolerable period of disruption (MTPD). The ITCP model serves as decision-support standards and rationale for choosing the most appropriate disaster recovery solution for differing business unit requirements.
  • Keywords
    banking; business continuity; information technology; planning; IT contingency planning; banking business; banking industry; decision-support standards; disaster recovery strategy selection; recovery point objective; recovery time objective; service availability; Availability; Banking; Business continuity; Contingency management; Information analysis; Investments; Process planning; Risk management; Strategic planning; Technology planning; Business Continuity Plans (BCP); Business Impact Analysis (BIA); Disaster Recovery (DR); Information Technology Contingency Planning (ITCP);
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Engineering Management Conference, 2008. IEMC Europe 2008. IEEE International
  • Conference_Location
    Estoril
  • Print_ISBN
    978-1-4244-2288-3
  • Electronic_ISBN
    978-1-4244-2289-0
  • Type

    conf

  • DOI
    10.1109/IEMCE.2008.4617953
  • Filename
    4617953