• DocumentCode
    2746487
  • Title

    Considerations For High Reliability Energy Sources For Nigeria Telecommunication Limited

  • Author

    Orokunle, S.B. ; Gropper, J.

  • Author_Institution
    NITEL
  • fYear
    2006
  • fDate
    Sept. 2006
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    Nigerian Telecommunication Ltd NITEL is the first national carrier in Nigeria, and is one of the two companies licensed to carry out the telecommunication carrier business in the country. Power generation within the company´s networks has remained for decades a determining factor in the evaluation of the reliability of the services provided. Hence, discussed in this paper are the migration processes with specific real-life experience on the installed power plants towards achieving high power system availability
  • Keywords
    power generation reliability; telecommunication network reliability; telecommunication power supplies; NITEL; Nigeria Telecommunication Limited; energy sources; migration processes; power generation reliability; telecommunication services; Companies; Control systems; Costs; Government; Maintenance; Monopoly; Power generation; Power system reliability; Telecommunication control; Telecommunication services;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Telecommunications Energy Conference, 2006. INTELEC '06. 28th Annual International
  • Conference_Location
    Providence, RI
  • Print_ISBN
    1-4244-0430-4
  • Electronic_ISBN
    1-4244-0431-2
  • Type

    conf

  • DOI
    10.1109/INTLEC.2006.251586
  • Filename
    4018088