DocumentCode
2746487
Title
Considerations For High Reliability Energy Sources For Nigeria Telecommunication Limited
Author
Orokunle, S.B. ; Gropper, J.
Author_Institution
NITEL
fYear
2006
fDate
Sept. 2006
Firstpage
1
Lastpage
5
Abstract
Nigerian Telecommunication Ltd NITEL is the first national carrier in Nigeria, and is one of the two companies licensed to carry out the telecommunication carrier business in the country. Power generation within the company´s networks has remained for decades a determining factor in the evaluation of the reliability of the services provided. Hence, discussed in this paper are the migration processes with specific real-life experience on the installed power plants towards achieving high power system availability
Keywords
power generation reliability; telecommunication network reliability; telecommunication power supplies; NITEL; Nigeria Telecommunication Limited; energy sources; migration processes; power generation reliability; telecommunication services; Companies; Control systems; Costs; Government; Maintenance; Monopoly; Power generation; Power system reliability; Telecommunication control; Telecommunication services;
fLanguage
English
Publisher
ieee
Conference_Titel
Telecommunications Energy Conference, 2006. INTELEC '06. 28th Annual International
Conference_Location
Providence, RI
Print_ISBN
1-4244-0430-4
Electronic_ISBN
1-4244-0431-2
Type
conf
DOI
10.1109/INTLEC.2006.251586
Filename
4018088
Link To Document