DocumentCode :
274754
Title :
Boiler soot-blowing optimisation for power generation plant
Author :
Thompson, S. ; Li, N.
Author_Institution :
Queen´´s Univ., Belfast, UK
fYear :
1991
fDate :
25-28 Mar 1991
Firstpage :
1277
Abstract :
Although the potential financial rewards accruing from the development of effective soot-blowing for large coal-fired boilers is well known, closed-loop control of soot-blowers has received little, if any, attention. For this reason, this paper which describes ongoing research in the area, first gives an overview of the subject. The paper then describes modifications, necessary to the basic heat transfer models used to determine boiler cleanliness. This modified on-line heat transfer model, which is demonstrated to be superior to the normal basic models, is then combined with an expert system. Closed-loop control may then be achieved, by using the output from the expert system to drive sequential soot-blowers
Keywords :
boilers; closed loop systems; expert systems; heat transfer; boiler cleanliness; closed-loop control; expert system; heat transfer models; power generation plant; soot-blowing optimisation;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Control 1991. Control '91., International Conference on
Conference_Location :
Edinburgh
Print_ISBN :
0-85296-509-5
Type :
conf
Filename :
98635
Link To Document :
بازگشت