• DocumentCode
    274869
  • Title

    Usage Reference Model for integrated broadband communications

  • Author

    Byerley, P. ; Keil, K.

  • Author_Institution
    Standard Elektrik, Lorenz, West Germany
  • fYear
    1990
  • fDate
    15-18 Oct 1990
  • Firstpage
    102
  • Lastpage
    106
  • Abstract
    The Usage Reference Model (URM) project (R1077) is responsible for consolidating the results of all the usage studies in RACE (application analysis, application pilots, usability studies) in order to provide operational requirements for IBC infrastructure design. Operational Requirements are defined as descriptions of the desired behaviour of a system from a user´s perspective. Prior to describing how they can be produced the authors address two issues which arise from the notion of `a user´s perspective´. Firstly, they consider the level of the application. Secondly, they address the specification of a communication infrastructure, so providing a description of the desired behaviour of a system from a user´s perspective
  • Keywords
    ISDN; broadband networks; IBC infrastructure design; ISDN; Operational Requirements; RACE; Usage Reference Model; application analysis; application pilots; integrated broadband communications; usability studies;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Integrated Broadband Services and Networks, 1990., International Conference on
  • Conference_Location
    London
  • Type

    conf

  • Filename
    114162