• DocumentCode
    275079
  • Title

    Advanced integration of LRT and traffic signals

  • Author

    Fehon, K.J. ; Tighe, W.A. ; Albers, A.O.

  • fYear
    1990
  • fDate
    1-3 May 1990
  • Firstpage
    209
  • Lastpage
    214
  • Abstract
    The Los Angeles Light Rail Transit (LRT) system will open on 4 July 1990. It will interact in various ways with the heavy rail and road systems. After a general description of the system, the article discusses the need for active signal priority and the objectives which the signal system seeks to meet. The components of the system-detectors, travel time predictors and controllers, and the central computer and SCADA centre,-are described. The system´s operation is then considered, and failure management is discussed
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Road Traffic Control, 1990., Third International Conference on
  • Conference_Location
    London
  • Type

    conf

  • Filename
    114409