• DocumentCode
    2751873
  • Title

    Efficient Construction in ALM with Assignment of Layered Degree and ALM-Bi-Cast

  • Author

    Su, Zhou ; Oguro, Masato ; Okada, Yohei ; Katto, Jiro ; Okubo, Sakae

  • fYear
    2009
  • fDate
    10-13 Jan. 2009
  • Firstpage
    1
  • Lastpage
    2
  • Abstract
    This paper designs a tree construction algorithm by distributing the layered steaming over the ALM in order to improve both the throughput and user delay. Firstly, by carrying out theory analysis, we define an out/in degree and the corresponding constraints to manage the layered streaming and nodes to improve the throughput. Besides, a novel method, called ALM-Bi-cast, is also proposed and analyzed to reduce user delay during the data-transmission. Secondly, by using the defined degrees and the ALM-Bi-cast, we present a tree construction algorithm and test it by simulations with NS-2. Simulations show that the proposal can get better results than other conventional methods. Finally, we carry out an implementation of our proposal, by distributing the video encoded by H.263+ over the ALM nodes placed in Tokyo City and Kyusyu Prefecture. Implementation further improves the out-performance of our proposal.
  • Keywords
    multicast communication; trees (mathematics); video coding; H.263+; Kyusyu Prefecture; NS-2; Tokyo City; application layer multicast; data-transmission; throughput; tree construction algorithm; user delay; video encoding; Algorithm design and analysis; Cities and towns; Constraint theory; Degradation; Delay; Partitioning algorithms; Streaming media; Testing; Throughput;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Consumer Communications and Networking Conference, 2009. CCNC 2009. 6th IEEE
  • Conference_Location
    Las Vegas, NV
  • Print_ISBN
    978-1-4244-2308-8
  • Electronic_ISBN
    978-1-4244-2309-5
  • Type

    conf

  • DOI
    10.1109/CCNC.2009.4784807
  • Filename
    4784807