• DocumentCode
    275201
  • Title

    ReDS: a planning and scheduling environment for manufacturing

  • Author

    Waele, W. De

  • Author_Institution
    Siemens Corp., Brussels, Belgium
  • fYear
    1990
  • fDate
    27-29 Jun 1990
  • Firstpage
    11
  • Lastpage
    15
  • Abstract
    ReDS (Requirements Driven Scheduler) is a knowledge-based scheduling system aimed at highly dynamic and flexible production environments. It was developed at Siemens Corporate Research and Support Inc. Siemens Corporation Brussels delivers customer support for ReDS users. The ReDS system has been applied successfully in several job-shop manufacturing environments within the Siemens concern. In this paper the author contrasts other approaches to shop-floor scheduling with the ReDS approach and highlight the most important features and techniques of the ReDS environment
  • Keywords
    expert systems; manufacturing data processing; scheduling; ReDS; Requirements Driven Scheduler; customer support; dynamic production environments; expert system; flexible production environments; job-shop manufacturing environments; knowledge-based scheduling system; planning; shop-floor scheduling;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Expert Planning Systems, 1991., First International Conference on
  • Conference_Location
    Brighton
  • Type

    conf

  • Filename
    114559