DocumentCode :
275201
Title :
ReDS: a planning and scheduling environment for manufacturing
Author :
Waele, W. De
Author_Institution :
Siemens Corp., Brussels, Belgium
fYear :
1990
fDate :
27-29 Jun 1990
Firstpage :
11
Lastpage :
15
Abstract :
ReDS (Requirements Driven Scheduler) is a knowledge-based scheduling system aimed at highly dynamic and flexible production environments. It was developed at Siemens Corporate Research and Support Inc. Siemens Corporation Brussels delivers customer support for ReDS users. The ReDS system has been applied successfully in several job-shop manufacturing environments within the Siemens concern. In this paper the author contrasts other approaches to shop-floor scheduling with the ReDS approach and highlight the most important features and techniques of the ReDS environment
Keywords :
expert systems; manufacturing data processing; scheduling; ReDS; Requirements Driven Scheduler; customer support; dynamic production environments; expert system; flexible production environments; job-shop manufacturing environments; knowledge-based scheduling system; planning; shop-floor scheduling;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Expert Planning Systems, 1991., First International Conference on
Conference_Location :
Brighton
Type :
conf
Filename :
114559
Link To Document :
بازگشت