DocumentCode
275215
Title
Constraint knowledge for construction scheduling
Author
Waugh, L.M. ; Froese, T.M.
Author_Institution
New Brunswick Univ., Fredericton, NB, Canada
fYear
1990
fDate
27-29 Jun 1990
Firstpage
114
Lastpage
118
Abstract
The capabilities of network diagramming techniques (NDT) are restricted by limitations inherent in their representation of schedule constraints (typically expressed through precedent relationships between activities). This assertion suggests the selection of a richer representation as a departure point for extending the utility of planning and scheduling techniques. The authors suggest that such a representation is provided by a system which employs a general model of a project´s `status´ and which allows schedule constraints to be expressed as rules which refer to this status. This system offers the advantages of allowing the precedence of activities to be based on more than just the completion of other activities. It also provides an efficient knowledge-based approach to scheduling that can express the reasoning underlying scheduling actions which can be employed by future artificial intelligence (AI) planning. The authors discuss how constraints are represented and describes what types of constraints can be represented in both NDT and in the proposed system-called A Construction Planner (ACP). This is followed by a comparison of the schedule generation algorithms used in NDT and in ACP
Keywords
construction industry; knowledge based systems; scheduling; A Construction Planner; ACP; artificial intelligence planning; construction scheduling; knowledge-based approach; precedence; precedent relationships; schedule constraint representation; schedule generation algorithms;
fLanguage
English
Publisher
iet
Conference_Titel
Expert Planning Systems, 1991., First International Conference on
Conference_Location
Brighton
Type
conf
Filename
114578
Link To Document