Abstract :
This paper describes how a reactive market could integrate with current transmission planning and operational arrangements. The paper contains a brief description of the present operational and planning processes for achieving acceptable voltage performance, and a description of how a competitive system for the provision of services could potentially be introduced such that the objectives and primary considerations of the existing arrangements are maintained