Improvement of Link Process in 4D CAD Viewer by Using Interface Board for Construction Project Management
Author
Kang Leen Seok ; Kim Hyoun Seong ; Moon Hyoun Seok ; Kim Chang Hak
Author_Institution
Gyeongsang Nat. Univ., JinJu, South Korea
fYear
2009
fDate
11-16 Oct. 2009
Firstpage
83
Lastpage
88
Abstract
Interference check process in construction schedule management is being one of important items as well as traditional scheduling analysis in project management. For visualizing interference check process, 4D CAD viewer is being gradually used in practical construction project. However, current 4D CAD system still needs more easy functions for practical application in construction site. To make a more easy function, it is necessary to equip a simple link system between 3D object and activity schedule. The link methodologies in current 4D CAD viewer should be improved with understanding of characteristic by each project type. This study suggests an improved and useful link methodology in 4D CAD system for plant project management. Plant project usually includes a great number of detailed elements in each functional facility. In that case, it is more important how it is easy to map 3D object with schedule in link process because the 3D drawings of each element should be linked with its schedule for visualizing 4D object. This study presents a new link process that the objects can be linked based on both 3D and schedule. That is, link process can be simple and easy procedure because the priority in link process can be both 3D object or schedule object by each element type. For developing the improved link system, this study introduces a concept of interface board that visualizes the detailed link phases including all objects in link process. Finally the suggested link process is verified in a developed 4D CAD viewer.
Keywords
CAD; construction industry; data visualisation; object-oriented methods; project management; scheduling; 4D CAD system; 4D CAD viewer; activity schedule; construction project management; construction schedule management; construction site; functional facility; interface board; interference check process; link methodology; plant project management; scheduling analysis; Project management; 3D Drawings; 4D CAD; Link System; Schedule Management; Virtual Reality (VR);
fLanguage
English
Publisher
ieee
Conference_Titel
Advanced Engineering Computing and Applications in Sciences, 2009. ADVCOMP '09. Third International Conference on
Conference_Location
Sliema
Print_ISBN
978-1-4244-5082-4
Electronic_ISBN
978-0-7695-3829-7
Type
conf
DOI
10.1109/ADVCOMP.2009.42
Filename
5359596
Link To Document