• DocumentCode
    2759761
  • Title

    Earliness/Tardiness Scheduling Problem under Uncertainty Based on Grey Chance Constrained Programming

  • Author

    Li, Bing ; Gu, Xingsheng

  • Author_Institution
    Res. Inst. of Autom., East China Univ. of Sci. & Technol., Shanghai
  • Volume
    2
  • fYear
    0
  • fDate
    0-0 0
  • Firstpage
    7272
  • Lastpage
    7276
  • Abstract
    Earliness/tardiness (E/T) scheduling problem under uncertainty are studied in this paper. The main work is to investigate the flow shop scheduling problem with distinct due windows. Uncertain processing time is expressed by grey number. The concept and method of grey simulation was put forward and grey simulation method was used to give the solution method for grey chance constrained programming. Finally, mathematical model for E/T flow shop scheduling which includes grey parameters is studied in details and how to use grey simulation technology to get the best result based on genetic algorithm is introduced. The effectiveness of the model and method is verified by simulation results
  • Keywords
    flow shop scheduling; genetic algorithms; grey systems; earliness-tardiness scheduling problem; flow shop scheduling; genetic algorithm; grey chance constrained programming; grey simulation; Automatic programming; Automation; Electronic mail; Genetic algorithms; Intelligent control; Job shop scheduling; Mathematical model; Uncertainty; Earliness/Tardiness (E/T); Flow shop scheduling; grey chance constrained programming; grey simulation; uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Control and Automation, 2006. WCICA 2006. The Sixth World Congress on
  • Conference_Location
    Dalian
  • Print_ISBN
    1-4244-0332-4
  • Type

    conf

  • DOI
    10.1109/WCICA.2006.1714498
  • Filename
    1714498