• DocumentCode
    2759786
  • Title

    A FLC-GA for Fuzzy Flow Shop Scheduling Problem with Distinct Due Window

  • Author

    Li Wang ; Du, Guangyu ; Zhang, QingLing

  • Author_Institution
    Sch. of Inf. Sci. & Eng., Northeastern Univ., Sheng
  • Volume
    2
  • fYear
    0
  • fDate
    0-0 0
  • Firstpage
    7277
  • Lastpage
    7281
  • Abstract
    This paper considers the fuzzy flow shop scheduling problem with distinct due window. Fuzzy processing time is denoted using triangular fuzzy number. A fuzzy programming model is established for this problem. The fuzzy objection function is transformed into deterministic function by using "Lee-Li" method. A genetic algorithm based on fuzzy logic controller (FLC-GA) is developed. The simulation results are given for the efficiency of the proposed algorithm
  • Keywords
    flow shop scheduling; fuzzy logic; fuzzy set theory; genetic algorithms; Lee-Li method; distinct due window; fuzzy flow shop scheduling; fuzzy logic controller; fuzzy objection function; fuzzy programming model; genetic algorithm; triangular fuzzy number; Automation; Fuzzy logic; Genetic algorithms; Information science; Intelligent control; Job shop scheduling; Paper technology; Tellurium; due window; fuzzy Flow Shop scheduling; fuzzy logic controller; genetic algorithm;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Control and Automation, 2006. WCICA 2006. The Sixth World Congress on
  • Conference_Location
    Dalian
  • Print_ISBN
    1-4244-0332-4
  • Type

    conf

  • DOI
    10.1109/WCICA.2006.1714499
  • Filename
    1714499