DocumentCode
2760586
Title
Optimum and heuristic data path scheduling under resource constraints
Author
Hwang, Cheng-Tsung ; Hsu, Yu-Chin ; Lin, You-Long
Author_Institution
Dept. of Comput. Sci., Tsing Hua Univ., Hsinchu, Taiwan
fYear
1990
fDate
24-28 Jun 1990
Firstpage
65
Lastpage
70
Abstract
An integer linear programming model for the scheduling problem in high-level synthesis under resource constraints is presented. The following applications are considered: multicycle operations with nonpipelined or pipelined function units: mutually exclusive operations: functional pipelining: loop-folding; and scheduling under bus constraint. Besides the model, a new technique, called zone scheduling (ZS), is proposed to solve large-size problems. ZS partitions the distribution graph into several zones and sequentially solves the problems contained. A novel feature of this technique is that it schedules more than one control step at a time, allowing a more global view of a scheduling problem to be taken
Keywords
VLSI; linear programming; pipeline processing; scheduling; distribution graph; functional pipelining; heuristic data path scheduling; high-level synthesis; integer linear programming model; large-size problems; loop-folding; multicycle operations; mutually exclusive operations; optimum data path scheduling; pipelined function units; resource constraints; scheduling under bus constraint; zone scheduling; Application software; Computer science; Hardware; Health information management; High level synthesis; Integer linear programming; Logic programming; Pipeline processing; Processor scheduling; Timing;
fLanguage
English
Publisher
ieee
Conference_Titel
Design Automation Conference, 1990. Proceedings., 27th ACM/IEEE
Conference_Location
Orlando, FL
ISSN
0738-100X
Print_ISBN
0-89791-363-9
Type
conf
DOI
10.1109/DAC.1990.114831
Filename
114831
Link To Document