  • Title

    Active and reactive power controls for the Gezhouba-Shanghai HVDC transmission scheme

  • Author

    Hammad, A. ; Koelsch, H. ; Daehler, P.

  • Author_Institution
    ABB Power Syst., Stockholm, Switzerland
  • fYear
    1991
  • fDate
    17-20 Sep 1991
  • Firstpage
    279
  • Lastpage
    284
  • Abstract
    The ±500 kV, 1200 MW HVDC transmission scheme, the first in China, interconnects the Central and Eastern China regional power systems over a distance of 1045 km. The scheme, known as GESHA, was commissioned in two stages in 1989 and 1990 respectively. The authors present a brief description of the HVDC transmission scheme and its principal modes of operation and the operating environment of the interconnected AC systems. Then, they focus on the novel control strategies for active and reactive powers adopted by the HVDC scheme to match the different requirements of the AC systems. Reactive power and AC voltage controls using the HVDC converter terminal-the first application in HVDC transmission systems-is explained in detail. Results of field tests made during the commissioning phases of the scheme to demonstrate these control features are also presented
  • Keywords
    DC power transmission; power control; power system control; power system interconnection; reactive power; voltage control; 1200 MW; 500 kV; AC voltage controls; GESHA; Gezhouba-Shanghai HVDC transmission scheme; active power control; converter terminal; interconnected AC systems; reactive power control;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    AC and DC Power Transmission, 1991., International Conference on
  • Conference_Location
    London
  • Print_ISBN
    0-85296-517-6
  • Type

    conf

  • Filename
    153917