Bound Duration Theorem and DCPM Network Reduction
Author
Zhang, L.H. ; Liu, Xiaoli ; Zhong, Gang
Author_Institution
Sch. of Bus. Adm., North China Electr. Power Univ. (NCEPU), Beijing, China
fYear
2009
fDate
6-7 June 2009
Firstpage
230
Lastpage
233
Abstract
Decision critical path method (DCPM) is an extend method of CPM. The advantage of DCPM is that one network can provide a wide range of options to decision-maker. However, there exist plenty of decision activities in DCPM network, which make DCPM network very complex and hard to compute, which restricts its application in practice. Through the study we found that, there are only a part of decision points would affect the project duration among so many decision activities. So reduction of DCPM network is a feasible way of solving the problem. In this paper, we put forward notions such as bound duration, effective decision path and then we gave bound duration theorem, reduction theorem of non-decision path and reduction theorem of decision path. Based on those theorems, a method of reducing DCPM network was proposed. By the method DCPM network can be simplified to the greatest extent.
Keywords
decision theory; project management; DCPM network reduction; bound duration theorem; decision critical path method; reduction theorem; Bismuth; Computer networks; Costs; Decision making; Electronic commerce; Genetic algorithms; Intelligent networks; Project management; Runtime; Upper bound; bound duration; dcpm; effective decision path; project management;
fLanguage
English
Publisher
ieee
Conference_Titel
Electronic Commerce and Business Intelligence, 2009. ECBI 2009. International Conference on
Conference_Location
Beijing
Print_ISBN
978-0-7695-3661-3
Type
conf
DOI
10.1109/ECBI.2009.119
Filename
5190445
Link To Document