DocumentCode :
2763768
Title :
Considering multi-evaluation perspectives in an agent-based FMS scheduling approach
Author :
Abaza, Ghada ; Badr, Iman ; Goehner, Peter ; Jeschke, Sabina
Author_Institution :
Inst. of Ind. Autom. & Software Eng., Stuttgart Univ., Stuttgart, Germany
fYear :
2011
fDate :
27-30 June 2011
Firstpage :
1779
Lastpage :
1784
Abstract :
For flexible manufacturing systems (FMS), scheduling approaches have been introduced to achieve optimized schedules while considering multiple optimization objectives. These objectives correspond mainly to the existing evaluation perspectives, namely, the system view and the customer view. The system view corresponds mainly to the maximization of resource utilization. The customer view corresponds to the minimization of jobs-makespans required for customer jobs to finish execution. These correspondent optimization objectives, in practice, are often conflicting and subject to certain constraints. In this paper, an agent-based scheduling approach for FMS is proposed. This approach takes into account both existing evaluation perspectives while generating FMS schedules. It seeks the maximization of the resource utilization and, simultaneously, the minimization of the involved jobs-makespans. Evaluation results recorded near-optimal schedules by the proposed scheduling process.
Keywords :
flexible manufacturing systems; optimisation; scheduling; agent based FMS scheduling; customer view; flexible manufacturing systems; jobs makespan minimization; multiple optimization objectives; resource utilization maximization; Job shop scheduling; Minimization; Optimization; Processor scheduling; Resource management; Schedules;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Electronics (ISIE), 2011 IEEE International Symposium on
Conference_Location :
Gdansk
ISSN :
Pending
Print_ISBN :
978-1-4244-9310-4
Electronic_ISBN :
Pending
Type :
conf
DOI :
10.1109/ISIE.2011.5984426
Filename :
5984426
Link To Document :
بازگشت