DocumentCode :
276478
Title :
An algorithm for load shedding and restoration during reduced generation periods
Author :
Wong, Kit Po ; Lau, Buon Sing
Author_Institution :
Western Australia Univ., Nedlands, WA, Australia
fYear :
1991
fDate :
5-8 Nov 1991
Firstpage :
521
Abstract :
During periods of reduced generation which occur as a result of industrial actions or of insufficient generation capacity load circuits are shed to maintain balance in generation and demand. In attempts to supply power to consumers fairly, circuits are taken out of service, and then restored, in a rotational manner. The manual process of decision making to shed and to restore loads my not lead to a fair power supply to consumers. the authors examine the main requirements and constraints in the operation during these periods. They develop an algorithm, which includes the main operational constraints, for shedding and restoration based on strategies for selecting circuits. The algorithm is implemented using the PROLOG language. Results obtained by applying the developed software system to a reduced generation period in a sample system lasting six hours are presented
Keywords :
expert systems; load shedding; power system computer control; power system restoration; PROLOG; algorithm; constraints; decision making; demand; digital control; expert systems; generation capacity; load shedding; power system restoration; reduced generation periods; software;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Advances in Power System Control, Operation and Management, 1991. APSCOM-91., 1991 International Conference on
Conference_Location :
IET
Print_ISBN :
0-86341-246-7
Type :
conf
Filename :
154128
Link To Document :
بازگشت