Title
Computerized control on 11 kV distribution network of the Hongkong Electric Co. Ltd
Author
Wan, W.K.
Author_Institution
Hongkong Electr. Co. Ltd., Hong Kong
fYear
1991
fDate
5-8 Nov 1991
Firstpage
527
Abstract
The author examines the development, operational experience, and future prospect of computerised control on the 11 kV distribution network of the Hongkong Electric Co. Ltd. (HEC). Computerized control proves to be successful in saving human efforts in carrying out switching manually at substations. Apart from saving time required for switching, it is also a safer means of switching. It also reduces the supply interruption time to an acceptable level in the event of a 11 kV cable fault and can be seen as an economical alternative to a full ring 11 kV network installed with unit protection
Keywords
distribution networks; electrical faults; power system computer control; substations; switching; 11 kV; Hongkong Electric Company; cable fault; computerised control; distribution network; substations; supply interruption time; switching;
fLanguage
English
Publisher
iet
Conference_Titel
Advances in Power System Control, Operation and Management, 1991. APSCOM-91., 1991 International Conference on
Conference_Location
IET
Print_ISBN
0-86341-246-7
Type
conf
Filename
154129
Link To Document