DocumentCode :
2764980
Title :
Optimizing Safety and Efficiency in the Mining Industry
Author :
Warren, Jody C. ; Shahroozi, Shah
Author_Institution :
Fluor Corp., Greenville, SC, USA
fYear :
2010
fDate :
3-7 Oct. 2010
Firstpage :
1
Lastpage :
6
Abstract :
This paper discuss the optimization of safety, schedule efficiency and cost effectiveness of delivering projects for the mining industry through implementation of pre-assemblies and modularization. This approach helps with reduction of the required on-site labor force by transferring a portion of the required effort-hours off-site. Projects in the mining industry are typically remotely located and therefore require additional effort hours dedicated to building workforce accommodations, camps and associated support infrastructures. All the required additional efforts combined with the project´s remote location tends to impose additional constraints on safety, productivity and project delivery schedule.
Keywords :
assembling; mining industry; occupational safety; productivity; project management; scheduling; effort hour offsite; mining industry; onsite labor force; preassembly; productivity; project delivery schedule; project remote location; safety optimization; workforce accommodation; Australia; Belts; Feeds; Layout; Materials; Solid modeling; Three dimensional displays;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industry Applications Society Annual Meeting (IAS), 2010 IEEE
Conference_Location :
Houston, TX
ISSN :
0197-2618
Print_ISBN :
978-1-4244-6393-0
Type :
conf
DOI :
10.1109/IAS.2010.5616002
Filename :
5616002
Link To Document :
بازگشت