End to end system test for Geshang ±500 kV HDVC project
Author
Nanchao, Zeng ; Lin, Ni Lin
Author_Institution
EPRI, Beijing, China
fYear
1991
fDate
5-8 Nov 1991
Firstpage
694
Abstract
An extensive end-to-end system test of China´s first ±500 kV HVDC line, the Gezhouba to Shanghai HVDC project, was completed in August, 1990. The items and results of this test are discussed. Several important events which occurred during the test as well as their reason and effects are described. Same valuable experiences are also discussed
Keywords
DC transmission networks; testing; 500 kV; China; Gezhouba-Shanghai HVDC line; HDVC project; end-to-end system test;