Title :
Testing of large telecommunication installations
Author_Institution :
GPT Ltd., Coventry, UK
Abstract :
Using the `representative system´ concept, a new test strategy has been developed, whereby the EMC performance of large systems may be determined under controlled conditions, prior to installation at customer premises. The effects of future extensions and upgrades may be examined for their impact on the EMC performance of the system without the need for costly retesting at the system level
Keywords :
electromagnetic compatibility; electronic equipment testing; private telephone exchanges; EMC performance; large telecommunication installations; representative system concept; telephone exchanges; test strategy;
Conference_Titel :
Development of EMC Standards for Information Technology Equipment, IEE Colloquium on
Conference_Location :
London