Title :
Neighborhood search algorithm for one-machine scheduling problem with time lags
Author :
Ruiguo, Zhao ; Jiejia, Li
Author_Institution :
LiaoNing Urban Constr. Sch., Shenyang, China
Abstract :
The one-machine scheduling problem with time lags while minimizing the completion time is NP-hard. The problem typically arises in a manufacturing where the next job has to be carried out in a specific time window after the completion of the immediately proceeding job. Scheduling the jobs is to find a shortest path that passes all the nodes and meets all precedence constraints and time lags constraints on AON (activity-on-node) net. A nonlinear mathematic optimization model is established based on AON net. A neighborhood search algorithm is proposed to convert the nonlinear model into a linear programming model that could be solved by standard software. Computational results prove that the proposed neighborhood search algorithm is effective.
Keywords :
delays; job shop scheduling; linear programming; manufacturing industries; nonlinear programming; search problems; single machine scheduling; AON; NP-hard problem; activity-on-node net; job scheduling; linear programming model; manufacturing industry; neighborhood search algorithm; nonlinear mathematic optimization model; one-machine scheduling problem; standard software; time lag constraint; Chemical industry; Civil engineering; Control engineering; Educational institutions; Job shop scheduling; Metals industry; Optimal scheduling; Processor scheduling; Scheduling algorithm; Time factors; AON Net; Neighborhood Search Algorithm; One-machine Scheduling; Time Lags;
Conference_Titel :
Control and Decision Conference, 2009. CCDC '09. Chinese
Conference_Location :
Guilin
Print_ISBN :
978-1-4244-2722-2
Electronic_ISBN :
978-1-4244-2723-9
DOI :
10.1109/CCDC.2009.5191609