The University of Liverpool designed, installed and project managed the first gas turbine combined heat and power system in an educational establishment in Western Europe. After a careful analysis of the systems available on the market at that time, a 3.65 MW generator set powered by a dual fuel turbine was chosen. The set can generate 7 MW of high pressure hot water via the recovery of the heat in a waste heat boiler in the turbine exhaust gases. However, as these exhaust gases contain a substantial quantity of unburned oxygen (around 11%), if they are reburned in a gas fired supplementary burner, the output can be boosted to 15 MW. The author briefly discusses the installation, operation, and grid connection of the CHP system
fLanguage
English
Publisher
iet
Conference_Titel
Parallel Operation of Generating Plant within a Public Electricity Supply Network, IEE Colloquium on
Conference_Location
Chester
Type
conf
Filename
181081
Link To Document