• DocumentCode
    278167
  • Title

    Oldbury boiler control system

  • Author

    March, A.R. ; Williams, T.B.

  • Author_Institution
    Div. of Oper. Eng., CEGB, Bristol, UK
  • fYear
    1991
  • fDate
    33308
  • Firstpage
    42430
  • Lastpage
    42434
  • Abstract
    The authors describe the replacement of the main boiler controls at Oldbury-on-Severn Nuclear Power Station. The original station equipment was replaced with modern digital equipment based on programmable logic controllers (PLCs). The authors describe the old system and the need for its replacement, and the principles of the new system. They then describe the design features of the new control system and discuss its implementation
  • Keywords
    digital control; fission reactor cooling and heat recovery; nuclear reactor steam generators; programmable controllers; MAGNOX; Oldbury-on-Severn Nuclear Power Station; boiler control system; digital equipment; programmable logic controllers;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Retrofit and Upgrading of Computer Equipment in Nuclear Power Stations, IEE Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • Filename
    181308