• DocumentCode
    2786984
  • Title

    The causes of prime contractor effort: lessons learned from spacecraft procurements

  • Author

    Leitch, Robert M.

  • Volume
    2
  • fYear
    2005
  • fDate
    Sept. 11-13, 2005
  • Firstpage
    887
  • Lastpage
    891
  • Keywords
    Aerospace engineering; Aircraft manufacture; Costs; Large-scale systems; Maintenance engineering; Procurement; Risk management; Space vehicles; Subcontracting; Systems engineering and theory;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Engineering Management Conference, 2005. Proceedings. 2005 IEEE International
  • Print_ISBN
    0-7803-9139-X
  • Type

    conf

  • DOI
    10.1109/IEMC.2005.1559277
  • Filename
    1559277