• DocumentCode
    2791665
  • Title

    Implementing SPC in a large manufacturing facility: an example

  • Author

    Kanthanathan, M. ; Wheeler, S.

  • Author_Institution
    IBM Corp., Austin, TX, USA
  • fYear
    1990
  • fDate
    1-3 Oct 1990
  • Firstpage
    200
  • Lastpage
    203
  • Abstract
    The authors explain how statistical process control (SPC) was successfully implemented in a large manufacturing facility. The broad philosophies that resulted in the successful implementation incorporate the following ingredients that were necessary to make the program successful: top management commitment, SPC training, an organized approach to implementation, and an SPC career path. Each of these topics is discussed. Auditing SPC implementation is considered
  • Keywords
    management; statistical process control; training; SPC; auditing; career path; management commitment; manufacturing facility; statistical process control; training; Circuit testing; Copper; Engineering profession; Management training; Manufacturing processes; Printed circuits; Process control; Production facilities; Pulp manufacturing; Resource management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electronic Manufacturing Technology Symposium, 1990 Proceedings, Competitive Manufacturing for the Next Decade. IEMT Symposium, Ninth IEEE/CHMT International
  • Conference_Location
    Washington, DC
  • Type

    conf

  • DOI
    10.1109/IEMT9.1990.115006
  • Filename
    115006