Title :
On-site loss tangent measurements of high voltage insulation
Author :
Wasilenko, E. ; Olesz, H.
Author_Institution :
Tech. Univ. of Gdansk, Poland
Abstract :
The authors´ work illuminates some problems encountered while on-site tests of high voltage insulation, especially such as that of measuring transformers. It has been proved that conventional, double-screened Schering bridge, operating with relatively low test voltage (e.g. 1-3 kV) can fulfil the requirements concerning the reliability of readings in high voltage environment, their broad interpretation, as well as in safety and manoeuvrability in operation
Keywords :
current transformers; dielectric loss measurement; high-voltage techniques; insulation testing; transformer insulation; 1 to 3 kV; double-screened Schering bridge; high voltage insulation; loss tangent measurements; measuring transformers; on-site tests; relatively low test voltage; reliability of readings; transformer insulation;
Conference_Titel :
Dielectric Materials, Measurements and Applications, 1992., Sixth International Conference on
Conference_Location :
Manchester
Print_ISBN :
0-85296-551-6