• DocumentCode
    279562
  • Title

    Realistic battleforce EMI testing-a summary of the US joint EMI (JEMI) test program

  • Author

    Oleksuk, Michael H. ; Canaga, Kenneth W.

  • fYear
    1992
  • fDate
    21-24 Sep 1992
  • Firstpage
    235
  • Lastpage
    239
  • Abstract
    Tasks assigned to the JEMI Joint Test Force (JFT) included: (1) developing a methodology which would provide system designers and operational planners with a capability to predict interservice EMI on the battlefield; (2) determining the effects of EMI on systems and operators; and (3) developing operational workarounds (i.e. alternative operating procedures) that would enable operators of weapon systems subjected to debilitating EMI to perform their missions. The culmination of the three-year JEMI joint test and evaluation performed by the JTF was a large-scale field test designated the Controlled Test. The authors outline the tests, equipment involved and test results
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electromagnetic Compatibility, 1992., Eighth International Conference on
  • Conference_Location
    Edinburgh
  • Print_ISBN
    0-85296-554-0
  • Type

    conf

  • Filename
    187226