Title :
Modeling and simulation of breakwater construction
Author :
Abraham, Dulcy M. ; Yeh, Miao-Hui Joanne ; Halpin, Daniel W.
Author_Institution :
Sch. of Civil Eng., Purdue Univ., West Lafayette, IN, USA
Abstract :
Discusses the application of computer simulation for the analysis of productivity of breakwater construction. Data collected from the first stage of the South Star Project in Taiwan is used in modeling and analysis. The South Star project involves embanking land from the sea, using industrial waste as deposits and expanding the seashore line as well as increasing land for the industrial city of Kaohsiung. The main benefit of this simulation analysis is a detailed look at the techniques for improving breakwater construction
Keywords :
civil engineering computing; digital simulation; human resource management; seawater; Kaohsiung; South Star Project; breakwater construction; computer simulation; industrial city; industrial waste deposits; land area increase; land embankment; productivity analysis; seashore line expansion; Analytical models; Application software; Cities and towns; Computational modeling; Computer simulation; Cyclones; Industrial waste; Production; Productivity; Protection;
Conference_Titel :
Simulation Conference Proceedings, 1995. Winter
Conference_Location :
Arlington, VA
Print_ISBN :
0-78033018-8
DOI :
10.1109/WSC.1995.478893