Time-Cost Tradeoff Problem of Human Resources Based on Hybrid GA
Author
Wei, Wen ; Yingchun, Chen ; Muqi, Chen
Author_Institution
Inst. of Tourism Manage., Xiangtan Univ., Xiangtan, China
Volume
2
fYear
2011
fDate
26-27 Nov. 2011
Firstpage
106
Lastpage
109
Abstract
As the duration of a large project is long, its consumption is significant. In order to complete the project efficiently, the project duration and the resources should be scheduled. During the project execution, if more resources are allocated, the make-span of an activity may be compressed. Thus, the project cost is a function of activity duration through the link of resources. Aimed at the time/cost tradeoff of human resources in a large engineering project, a linear programming model is introduced. A heuristic genetic algorithm is proposed based on queuing theory, where queuing theory is used to process resource constraint. Because of the particularity of the problem, specific encoding scheme, crossover and mutation operators are designed. Illustrative example shows the validity of the methods.
Keywords
construction industry; encoding; genetic algorithms; human resource management; linear programming; queueing theory; resource allocation; encoding scheme; heuristic genetic algorithm; human resource; hybrid GA; large engineering project; linear programming model; mutation operator; project duration; project execution; queuing theory; resource constraint process; time-cost tradeoff problem; Computational modeling; Genetic algorithms; Humans; Manganese; Mathematical model; Optimization; Queueing analysis; genetic algorithm; human resource; linear programming; queuing theory; time-cost tradeoff;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Management, Innovation Management and Industrial Engineering (ICIII), 2011 International Conference on
Conference_Location
Shenzhen
Print_ISBN
978-1-61284-450-3
Type
conf
DOI
10.1109/ICIII.2011.172
Filename
6114638
Link To Document