DocumentCode :
2802014
Title :
Upgrade of the Department of Energy´s Savannah River Site´s reactor operations and maintenance procedures
Author :
Walsh, T.E.
Author_Institution :
Westinghouse Savannah River Co., Aiken, SC, USA
Volume :
1 & 2
fYear :
1991
fDate :
30 Oct-1 Nov 1991
Firstpage :
375
Abstract :
The author describes the program in progress at the Savannah River Site (SRS) to upgrade the existing reactor operating and maintenance procedures to current commercial nuclear industry standards. In order to meet this goal, the following elements were established: (1) administrative procedures to govern the upgrade process, (2) a tracking system to provide status and accountability, and (3) procedure writing guides. The goal is to establish a benchmark of excellence by which other Department of Energy sites will measure themselves. The above three elements are addressed in detail
Keywords :
fission reactors; maintenance engineering; management; technical presentation; Savannah River Site; administrative procedures; maintenance procedures; nuclear industry standards; procedure writing guides; tracking system; Communication industry; Communication standards; Guidelines; Inductors; Laboratories; Production; Professional communication; Qualifications; Rivers; US Department of Energy;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Professional Communication Conference, 1991. IPCC '91. Proceedings. The Engineered Communication., International
Conference_Location :
Orlando, FL
Print_ISBN :
0-7803-0482-9
Type :
conf
DOI :
10.1109/IPCC.1991.172809
Filename :
172809
Link To Document :
بازگشت