The application of fuzzy comprehensive evaluation method in factory site scheme selection of thermo-electricity project
Author :
Li, Mingshun ; Wang, Hongyu
Author_Institution :
Sch. of Traffic & Transp. Eng., Changsha Univ. of Sci. & Technol., Changsha, China
Abstract :
Factory site scheme selection of thermo-electricity project is an important work, which directly affect whether the project can achieve the desired objectives and post-project operation effects. This paper discussed the factory site scheme selection using multi-level fuzzy comprehensive evaluation method, combining with the characteristics of factory site scheme selection; finally demonstrate the scientific and fair of the model with examples.
Keywords :
fuzzy set theory; thermal power stations; factory site scheme selection; multilevel fuzzy comprehensive evaluation method; post-project operation effects; thermoelectricity project; Cities and towns; Economics; Geology; Indexes; Power generation; Production facilities; Transportation; fuzzy comprehensive evaluation; index system; scheme selection; thermo-electric project;
Conference_Titel :
Mechanic Automation and Control Engineering (MACE), 2011 Second International Conference on
Conference_Location :
Hohhot
Print_ISBN :
978-1-4244-9436-1
DOI :
10.1109/MACE.2011.5987533