DocumentCode
280372
Title
Stray current control-an arbitrators view
Author
Davis, A.J.
fYear
1990
fDate
33157
Firstpage
36923
Lastpage
38749
Abstract
Leakage of direct currents to earth, and thence to buried metallic structures, from distributed supplies whilst returning to the point of supply for the section is an accepted fact. The damage that may be caused by stray traction currents emanating from a newly constructed DC railway system may be extensive and the `owner´ of such damaged metalwork will inevitably seek compensation and assurances that all that can be done, as far as is reasonably practicable, to prevent or minimise electrolytic corrosion will be undertaken. The author discusses these problems from the Department of Transport´s Railway Inspectorate´s Arbitrator in connection with the Manchester Metrolink project. The problems faced at the design stage are discussed
fLanguage
English
Publisher
iet
Conference_Titel
Stray Current Effects of DC Railways and Tramways, IEE Colloquium on
Conference_Location
London
Type
conf
Filename
190621
Link To Document