DocumentCode :
280882
Title :
Maintenance in an industrial CHP station
Author :
Bowman, P.R.
fYear :
1990
fDate :
33205
Firstpage :
42430
Lastpage :
42434
Abstract :
Merseyside power station (MPS) was built in 1957 to supply steam and power to Unilever and third party companies in the Port Sunlight and Bromborough areas. There are four maintenance areas: the engine generator; the water treatment plant; the boiler control and instrumentation systems; and the HV system. Preventive maintenance is also discussed
fLanguage :
English
Publisher :
iet
Conference_Titel :
Maintenance Practices for Power Generation, IEE Colloquium on
Conference_Location :
London
Type :
conf
Filename :
191340
Link To Document :
بازگشت