• DocumentCode
    281338
  • Title

    Manufacturing workcell modelling and task facility

  • Author

    Govindaraj, Subbian ; Doty, Keith L.

  • Author_Institution
    Dept. of Electr. Eng., Florida Univ., Gainesville, FL, USA
  • fYear
    1988
  • fDate
    11-13 Apr 1988
  • Firstpage
    492
  • Lastpage
    496
  • Abstract
    The manufacturing workcell modeling and tasking facility acts as an interface between the physical world of the manufacturing workcell and the database of workcell models and tasks. The modeling and monitoring interface provides an expert manufacturing user with a data definition language for describing instances of manufacturing workcell components. The tasking interface uses the workcell models and task specifications in the database to plan, simulate, execute and monitor the task execution in cooperating multi-robot workcells. The planner iteratively generates and evaluates task plans until a simulation successful task plan results. The task plan is then submitted to the manufacturing workcell controller
  • Keywords
    CAD; industrial robots; manufacturing computer control; operations research; user interfaces; cooperating multi-robot workcells; data definition language; instances of manufacturing workcell components; manufacturing workcell; manufacturing workcell controller; manufacturing workcell modeling; monitoring interface; task execution; task plans; task specifications; tasking facility; tasking interface; workcell models; Databases; LAN interconnection; Machine vision; Manipulators; Manuals; Manufacturing processes; Object oriented modeling; Packaging; Testing; Virtual manufacturing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Southeastcon '88., IEEE Conference Proceedings
  • Conference_Location
    Knoxville, TN
  • Type

    conf

  • DOI
    10.1109/SECON.1988.194906
  • Filename
    194906