• DocumentCode
    281358
  • Title

    Cost-estimation by analogy as a good management practice

  • Author

    Cowderoy, A.J.C. ; Jenkins, J.O.

  • Author_Institution
    Manage. Sch., Imperial Coll., London, UK
  • fYear
    1988
  • fDate
    11-15 Jul 1988
  • Firstpage
    80
  • Lastpage
    84
  • Abstract
    It is widely-believed that software-development projects are almost always late. Good estimation techniques can help by providing an incentive to improve working practices, such as increasing the consistency of the development process. The authors give a summary of estimation methods, a model of the estimation process and a meta-model for estimation by analogy. They discuss future work and automation of the models. They believe that the analogy meta-model, used in the manner described by the estimation process model, will improve the standard of project management
  • Keywords
    DP management; estimation theory; software engineering; DP management; analogy meta-model; cost estimation; estimation by analogy; estimation process model; meta-model; software-development projects; working practices;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Software Engineering, 1988 Software Engineering 88., Second IEE/BCS Conference:
  • Conference_Location
    Liverpool
  • Type

    conf

  • Filename
    196365