Title :
Research on process planning and progress control for large-scale ship building
Author :
Li, Guojie ; Su, Shaohui ; Chen, Guojin ; Xu, Lei
Author_Institution :
Sch. of Mech. Eng., Hangzhou Dianzi Univ., Hangzhou, China
Abstract :
Shipbuilding is a complex systematical work, therefore planning and controlling shipbuilding course is a big system engineering. In order to legitimately plan and control ship construction procedure, we employ process modeling technology, process programming technology and conflict resolution mechanism, which are at the base of the time database. We also apply the Kanban management based on WBS (Work Breakdown Structure). In the display boards, different color reveals the processing state of each division, which help the relevant principals have a objective understanding of the shipbuilding procedure. The theory introduced in present paper aim to realize process planning and time controlling of shipbuilding procedure, and to ensure controlling the productive time will be come true.
Keywords :
kanban; process control; process planning; production engineering computing; shipbuilding industry; Kanban management; WBS; conflict resolution mechanism; large-scale ship building; process modeling technology; process planning; process programming technology; progress control; ship construction procedure control; shipbuilding course control; system engineering; work breakdown structure; Computational modeling; Computers; Information systems; Marine vehicles; Process control; Process planning; Unified modeling language; Process Planning; Progress Control; large-scale ship; process modeling;
Conference_Titel :
Mechanic Automation and Control Engineering (MACE), 2011 Second International Conference on
Conference_Location :
Hohhot
Print_ISBN :
978-1-4244-9436-1
DOI :
10.1109/MACE.2011.5988247