DocumentCode :
282147
Title :
Heuristics for project expedition
Author :
Barber, T.J.
fYear :
1989
fDate :
32587
Firstpage :
42552
Lastpage :
42557
Abstract :
A prototype system which allows a project network to be portrayed graphically as a CPA network on a high-resolution workstation. Initially, the project network is described, the system calculates the natural completion date of the project from standard CPA calculations. The user is then able to specify a target completion date. An algorithm then examines the network to identify all the activities which, if expedited, could reduce the project duration, these are the initial set of activities to consider for expedition. A knowledge based system then postulates an expedition strategy for each of these activities, this is performed by a detailed analysis of much project data. From each selected strategy the knowledge based system goes on to estimate the resultant time-cost trade-off function. It is from this point that a heuristic algorithm can be invoked, the degree of influence of the various heuristics can be set beforehand
fLanguage :
English
Publisher :
iet
Conference_Titel :
Advances in Optimisation, IEE Colloquium on
Conference_Location :
London
Type :
conf
Filename :
198727
Link To Document :
بازگشت