The impact of time-of-use bulk supply electricity prices on a neighbouring cogenerating utility
Author
Campbell, Ken J. ; Taylor, Ray W.
Author_Institution
ESKOM, Johannesburg, South Africa
fYear
1992
fDate
22-24 Sep 1992
Firstpage
596
Lastpage
600
Abstract
The authors describe the process of converting Transkei Electricity Supply Corporation (TESCOR) from a conventional "maximum demand" tariff (Tariff A) to a radically new, all kilowatt-hour, time-of-use option (Tariff T2). The purchase of electricity on time-of-use tariffs has a significant impact on the way cogenerating utilities schedule their own generation, design their system control and data acquisition systems, and plan further generating capacity requirements. It is concluded that, for cogenerating utilities using hydro-generation, particularly when significant water storage is available, purchasing electricity from Eskom on time-of-use tariffs offers the prospective advantage of reduced electricity import costs, the opportunity to improve short-term cash flows, reduced operating and maintenance costs, and an overall reduction in system control complexity
Keywords
electricity supply industry; South Africa; bulk supply electricity prices; cogeneration; control systems; data acquisition systems; design; electric utility; electricity import costs; generation scheduling; hydro-generation; maintenance costs; operating costs; purchase; short-term cash flows; tariffs; time-of-use; water storage; Africa; Costs; Energy consumption; Energy conversion; Energy management; Load management; Power generation; Pricing; Resistance heating; Scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
AFRICON '92 Proceedings., 3rd AFRICON Conference
Conference_Location
Ezulwini Valley
Print_ISBN
0-7803-0835-2
Type
conf
DOI
10.1109/AFRCON.1992.625652
Filename
625652
Link To Document