Heuristics of Scheduling a Single Crane in Batch Annealing Process
Author
Xie, Xie ; Tang, Lixin
Author_Institution
Logistics Inst., Northeastern Univ., Shenyang, China
Volume
2
fYear
2009
fDate
24-26 April 2009
Firstpage
891
Lastpage
894
Abstract
The problem studied in this paper concerns enough two-category machine scheduled by a single crane in batch annealing process in the iron and steel manufactory. In the process, machines (furnace and cooler) have to be loaded (unloaded) on (from) jobs sequentially according to technological requirement by crane. This problem can be viewed as two-stage flexible flow shop with additional transportation consideration. Our objective is to minimize the maximum completion time of the last annealed job (makespan). For the strongly NP-hard nature, we mainly propose three heuristics. In order to verify these heuristics, we analyze them from absolute performance point of view and provide the computational experiments.
Keywords
annealing; batch processing (industrial); computational complexity; cranes; flow shop scheduling; steel industry; NP-hard problem; batch annealing process; iron and steel manufactory; scheduling heuristics; single crane; two-stage flexible flow shop; Annealing; Cooling; Cranes; Furnaces; Heating; Iron; Job shop scheduling; Logistics; Processor scheduling; Steel;
fLanguage
English
Publisher
ieee
Conference_Titel
Computational Sciences and Optimization, 2009. CSO 2009. International Joint Conference on
Conference_Location
Sanya, Hainan
Print_ISBN
978-0-7695-3605-7
Type
conf
DOI
10.1109/CSO.2009.154
Filename
5194087
Link To Document