    Heuristics of Scheduling a Single Crane in Batch Annealing Process

  • Author

    Xie, Xie ; Tang, Lixin

  • Author_Institution
    Logistics Inst., Northeastern Univ., Shenyang, China
  • Volume
    2
  • fYear
    2009
  • fDate
    24-26 April 2009
  • Firstpage
    891
  • Lastpage
    894
  • Abstract
    The problem studied in this paper concerns enough two-category machine scheduled by a single crane in batch annealing process in the iron and steel manufactory. In the process, machines (furnace and cooler) have to be loaded (unloaded) on (from) jobs sequentially according to technological requirement by crane. This problem can be viewed as two-stage flexible flow shop with additional transportation consideration. Our objective is to minimize the maximum completion time of the last annealed job (makespan). For the strongly NP-hard nature, we mainly propose three heuristics. In order to verify these heuristics, we analyze them from absolute performance point of view and provide the computational experiments.
  • Keywords
    annealing; batch processing (industrial); computational complexity; cranes; flow shop scheduling; steel industry; NP-hard problem; batch annealing process; iron and steel manufactory; scheduling heuristics; single crane; two-stage flexible flow shop; Annealing; Cooling; Cranes; Furnaces; Heating; Iron; Job shop scheduling; Logistics; Processor scheduling; Steel;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computational Sciences and Optimization, 2009. CSO 2009. International Joint Conference on
  • Conference_Location
    Sanya, Hainan
  • Print_ISBN
    978-0-7695-3605-7
  • Type

    conf

  • DOI
    10.1109/CSO.2009.154
  • Filename
    5194087