• DocumentCode
    282403
  • Title

    Fast calculation of negative phase sequence in 3-phase systems for rapid unbalance assessment

  • Author

    Wong, K.T.

  • Author_Institution
    EPD Consultants Ltd., Sidcup, UK
  • fYear
    1989
  • fDate
    32846
  • Firstpage
    42461
  • Lastpage
    42464
  • Abstract
    An algorithm for fast evaluation of negative phase sequence voltage caused by three phase-to-phase loads has been described. It is specially useful in the determination of an optimal power supply scheme where unbalance level at the PCC needs to be kept low. The algorithm can be extended to any calculations which involve the summation of three 120° phase displaced phasors or vectors
  • Keywords
    power systems; 3-phase systems; negative phase sequence; optimal power supply scheme; rapid unbalance assessment; three phase-to-phase loads;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Safeguarding Industrial Plant During Power System Disturbances, IEE Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • Filename
    199122