DocumentCode
2824031
Title
Scheduling of combined heat and power plants by considering risk management
Author
Zafra-Cabeza, Ascensi ón ; Ridao, Miguel A. ; Camacho, Eduardo F.
Author_Institution
Univ. of Seville, Seville
fYear
2007
fDate
12-14 Dec. 2007
Firstpage
5459
Lastpage
5464
Abstract
This paper shows how risk management can be applied to combined cycle power plants to take into account the uncertainties of the process. The main innovative point is the consideration of additional mitigation actions to reduce the exposure of the identified risks. Model predictive control is used to select the strategic plan to execute according to an index performance. The scheduling may be focused on short-term or long-term range, depending on the sample time, objectives and parameters to evaluate. This work is applied to long-term scheduling to study the viability of the plant. A simulation model has been considered to show the benefits of the method.
Keywords
cogeneration; power generation control; power generation scheduling; power system management; predictive control; risk management; uncertain systems; combined heat and power plant scheduling; index performance; model predictive control; risk management; strategic plan; Cogeneration; Economic forecasting; Job shop scheduling; Power generation; Power generation economics; Predictive control; Predictive models; Risk management; Turbines; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Decision and Control, 2007 46th IEEE Conference on
Conference_Location
New Orleans, LA
ISSN
0191-2216
Print_ISBN
978-1-4244-1497-0
Electronic_ISBN
0191-2216
Type
conf
DOI
10.1109/CDC.2007.4434582
Filename
4434582