Title :
A hydroelectric station intake construction simulation of high slope excavation
Author :
Wang Changyong ; Zhao Hongmin
Author_Institution :
Nanyang Inst. of Technol., Nanyang, China
Abstract :
By using the finite element method calculation model, the construction of high rock slope excavation analysis and simulation of construction process simulation, and with the monitoring results were analyzed. Feature points on the slope of the calculated displacement of the outer section layout view is consistent with the measured displacement, the bolt stress gauge measured and calculated in terms of size and rules are basically the same.
Keywords :
finite element analysis; geotechnical engineering; hydroelectric power; hydroelectric power stations; bolt stress gauge; construction process simulation; finite element method calculation model; high rock slope excavation analysis; high slope excavation; hydroelectric station intake construction simulation; Displacement measurement; Finite element methods; Manuals; Monitoring; Rocks; Stress measurement; excavation step; high slope; intake; simulation analysis;
Conference_Titel :
Mechanic Automation and Control Engineering (MACE), 2011 Second International Conference on
Conference_Location :
Hohhot
Print_ISBN :
978-1-4244-9436-1
DOI :
10.1109/MACE.2011.5988688