Title :
Modeling and Optimization of Hull Building Process Based on P-TPN
Author :
Zhang, Yongquan ; Xu, Kelin ; Hong, Xudong
Author_Institution :
Sch. of Mech. Eng., Tongji Univ., Shanghai, China
Abstract :
Due to the low efficiency of hull building, this paper applies timed place petri net to model and optimize the process of hull construction scheduling. We adjust the orientation block, eliminate the hatch coaming section, repartition the complicated blocks and reduce the construction difficulty. Modularization building and flow line construction are realized for most blocks. The result shows the efficiency has been enhanced greatly. Finally, according to the reasonable existing time of the markings, whether a given construction state is on rational construction schemes can be judged.
Keywords :
Petri nets; optimisation; shipbuilding industry; P-TPN; flow line construction; hull building process; hull construction scheduling; modularization building; optimization; rational construction scheme; timed place petri net; Algebra; Buildings; Equations; Instruments; Mechanical engineering; Modular construction; Path planning; Project management; Software tools; Tellurium; P-TPN; hull building process; modeling; optimization;
Conference_Titel :
Computational Sciences and Optimization, 2009. CSO 2009. International Joint Conference on
Conference_Location :
Sanya, Hainan
Print_ISBN :
978-0-7695-3605-7
DOI :
10.1109/CSO.2009.394