• DocumentCode
    2825250
  • Title

    Reducing gauging lead times and optimizing layout design at GM Powertrain with 3D workcell simulation

  • Author

    Khanolkar, Rohit A.

  • Author_Institution
    Appl. Manuf. Technol., Orion, MI, USA
  • Volume
    2
  • fYear
    2000
  • fDate
    2000
  • Firstpage
    1355
  • Abstract
    This paper describes an application of 3D-workcell simulation for assessing feasibility of a concept Powertrain gauging process. It provides a basic introduction to 3D-Workcell simulation and it´s associated benefits. It describes the previous process, its limitations and problems, and also the design reviews and iterations that were performed in simulation to arrive at a new, optimized process. This new process minimizes operator handling of product and also reduces the tasks involved in completing the manual gauging operation. This paper describes how 3D-Workcell simulation was instrumental in identifying design and layout flaws prior to equipment build and install
  • Keywords
    digital simulation; industrial control; 3D workcell simulation; Powertrain gauging process; design reviews; gauging lead times; layout design; manual gauging operation; operator handling; Design optimization; Engines; Lead time reduction; Logic programming; Manuals; Manufacturing industries; Manufacturing processes; Mechanical power transmission; Process design; Virtual manufacturing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference, 2000. Proceedings. Winter
  • Conference_Location
    Orlando, FL
  • Print_ISBN
    0-7803-6579-8
  • Type

    conf

  • DOI
    10.1109/WSC.2000.899109
  • Filename
    899109